Embroidery Pricing Calculator
Built for machine embroiderers: estimated run time from stitch count, digitising spread across the order, and what you actually earn per hour.
Design & Machine
Stitches per minute from your machine spec
Thread changes, trims and slowdowns — 70–80% is typical
Order & Costs
Spread automatically across the quantity
Allowance for misstitched or spoiled items
Step 3 – Your Results
Enter your design’s stitch count and order details — results update instantly.
MakerCalc provides estimates based on the information entered and the latest fee information we have verified. Marketplace fees, taxes and seller-specific charges can vary. Always confirm important pricing decisions against your marketplace account and official documentation.
How run time is estimated
Estimated running time = stitch count ÷ effective stitch speed, where effective speed is your machine’s rated speed × real-world efficiency. A machine rated at 1,000 stitches per minute running at 75% efficiency stitches about 750/minute — so a 15,000 stitch design takes roughly 20 minutes, before hooping, thread changes and finishing.